Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

May 05, 2022     EGT probes; Smoke oil injectors - (4.3 hours)       Category: Firewall Forward
1. Installed the remaining two EGT probes (cylinders #2 and #4).
2. Bundled and secured most of the remaining CHT and EGT probe wires. (I'm still waiting for one more #27 Adel clamp to complete this job.)

3. Trimmed the steel support bar of one of the smoke injectors to keep it clear of a pipe weld.
4. Located and drilled the two 3/8" holes in the #2 and #4 exhaust pipes for the smoke injectors.
5. Installed both injectors and temporarily attached the smoke oil lines to check their fit.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.